Following up from my last blog about the 2015 International Energy Conservation Code (IECC), let’s take a look at what makes this latest version of the code different from the 2012 IECC. The biggest alteration that will affect builders is the addition of an Energy Rating Index compliance path, as discussed in my earlier blog post. However, that’s not the only change builders should note.
The top five major adjustments in the 2015 IECC that will affect new home construction are detailed below:
1. REQUIRED INSPECTIONS. Section 104 was revised to list
and describe required inspections as footing and foundation, framing and rough-in, plumbing rough-in, and mechanical rough-in.
What’s the
difference? The 2012 IECC simply says that “work shall not be
done beyond the point indicated in each successive inspection without first
obtaining the approval of the code official.” This provides no guidance or
indication of which inspections are required. The new 2015 provisions, however,
specify when the inspection should be done and what should be inspected.
Potential impact: Because
many local jurisdictions delete Chapter 1 and reference their own
administrative procedures, it’s possible that the impact of this change will be
minimal, but it will be felt the most where a jurisdiction adopts the new
inspection requirements. In those areas, builders will have to adapt to the
change by not covering up the items that need to be looked at and requesting
inspections at the appropriate times.
2. BUILDING ENVELOPE AIR LEAKAGE TESTING. Building envelope air leakage
testing must now be done in accordance with either ASTM E 779 or ASTM E 1827.
What’s the difference? In both the
2009 and 2012 versions of the IECC there were requirements for air leakage
testing of the building envelope, but neither code referenced any standard by
which to conduct the test. The 2015 code now requires that one of the two ASTM
standards be followed when conducting the air leakage test.
Potential impact: The impact
of this requirement is expected to be minimal, but make sure your air leakage
testers know the ASTM standard.
3. COMBUSTION CLOSETS. There is a new section, R402.4.4—“Rooms
containing fuel burning appliances,” that states “where open combustion air
ducts provide combustion air to open combustion fuel burning appliances, the
appliance and combustion air opening shall be located outside the building
thermal envelope or enclosed in a room, isolated from inside the thermal
envelope.” This new requirement only applies in Climate Zones 3-8, but requires
combustion closets to be insulated to levels not less than the basement wall
R-value requirements in Table R402.1.2. The closet must also be air sealed and
the door must be fully gasketed.
What’s the difference? This is an
entirely new requirement.
Potential impact: Complying
with this new requirement could cost a few hundred dollars, depending on your
current construction practices. There are several options for complying: (1)
Install direct vent appliances (i.e., high-efficient furnace and water heater)
where both intake and exhaust pipes are continuous to the outside; (2) Where
you have combustion air ducts (often called hi/low vents) bringing combustion
air to an atmospherically vented appliance, you can enclose the appliance in a
combustion closet; (3) Don’t use combustion appliances (i.e., build an
all-electric house); or (4) Locate your combustion appliances outside the
building thermal envelope (i.e., in an unfinished basement with insulation in
the floor joists or in an attic where the roofline is uninsulated).
4. VERTICAL ACCESS DOORS. A new exception has been added to Section R402.2.4—“Access hatches and doors.” This exception allows vertical doors that provide access from conditioned to unconditioned spaces to meet the fenestration requirements in Table R402.1.2.
What’s the difference? This change means that these types of doors, such as attic kneewall doors and other vertical attic access doors, do not have to be insulated to the same level as the surrounding wall, as long as they meet the fenestration U-factor requirements specified in the table.
Potential impact: This change now allows the option of using an exterior door that meets the U-value requirements of an interior door with enough insulation attached to the back to meet the vertical access door requirement.
5. DUCT INSULATION. The requirements for duct
insulation have been revised slightly. The new language makes duct insulation
requirements dependent on location and the diameter of the duct.
What’s the difference? The 2012
IECC requires supply ducts in the attic to be R-8 and all other ducts R-6. The
2015 code revises the requirements as follows:
·
Supply and
return ducts in the attic must be a minimum of R-8 (where ≥3-inch diameter) and
R-6 (where <3-inch diameter).
·
Supply and
return ducts everywhere else must be a minimum of R-6 (where ≥3-inch diameter)
and R-4.2 (where <3-inch diameter).
Potential impact: Although
these revisions allow more flexibility, they also require careful attention by your
HVAC contractor to not mix up insulation values. Of course, there is always the
exception which allows for ducts (or portions of ducts) located completely
inside conditioned space not to be insulated. There is also the option to specify
all ducts in the attic to be R-8 and everywhere else to be R-6.
Overall, builders will find the 2015
IECC to be a better code than the 2012 version. Not only does it allow for a
new and more flexible compliance path (the ERI Compliance Path, discussed in
our previous blog post), but also many of the small changes, not included here,
have cleaned up the language to make the code easier to understand and comply
with. To dig into these changes and many other small revisions, you can read a
fact sheet my team created here.