Posted on:

Villa Asara

Jafar Lotfolahi

Shared By



Moharam Ahmadi


  • Civil Engineer: Mohamad Ebrahimi
  • Construction Manager: Moharam Ahmadi
  • Electrical Engineer: Mohamad Farmand
  • Mechanical Engineer: Asghar Sadati
  • General Contractor: Abdolah Qolami
  • General Contractor: Asghar Ahmadpour

Project Status


Year Completed



367,911 sq. meters

Construction Cost

View all (14) images

Project Description

90 percent of Iran's total area is dry and semi-dry. In recent years the demand to live in green areas has intensified as a result the amount of construction in these areas has risen and contributes to environmental degradation.
The site is located in a peaceful and quiet strait, near to the river and consists of two parts, the northward, without vegetation and 45 to 60 degree slope, the southward with flat land, two rows of poplar trees and landscaping throughout the site.
The beautiful scenery surrounding the site, hillside enhance to maximize the panoramic vistas and maximum use of the site potential. To prevent the destruction of green space, the building set on a hillside, so function and shape of the villa formed based on extensive in two axis, Z pivot to enthrone the building and left the ground, Y pivot to involve in panoramic views, thus the high level assigned to living space and low level assigned to sleep and guest space.

Join the Discussion

Please read our Content Guidelines before posting


Jafar Lotfolahi
2 Projects
BUILDER Local Housing Data
Watch BUILDER videos
Close X