From Factory to Foundation

The wall panels are manufactured inside the Eagle River, Wis., factory.

A crane is used to move them onto a truck for delivery.

Panels for one house can fit on one truck, the company says.

Workers prepare the footings.

The panels are craned into place on site.

The panels are connected to each other.

A worker connects two panels.

Flooring is added above the foundation.

The exterior is prepared for finishing.

A stone-look finish

The interior is complete.

Join the Discussion

Please read our Content Guidelines before posting

Close X